+49 (0)8141 88869 71 | Mo-Fr: 10-12/14-18, Sa: 10-14 info@cptgl.com

1.177,00 €

SKU: 5890 Category: Tag:

Precious wood housing
Condition: Very Good
SerNo: ST0172
Weight: 29.2 kg
Shipping class: Heavy
Case/Case: Cover
Documents: Manual/News Sheet
Other: Hangtag
Brokerage sale: 13889

1.177,00 €

Out of stock

Out of stock

Du hast Fragen zu diesem Artikel?
Ruf uns an     +49 (0)8141 8886971
oder schreib uns eine Nachricht

Super rare 1990 Mesa Boogie Simul-Satellite 1x12 combo with original Electro-Voice EVM 12L speaker and high-quality wooden cabinet.
Class A circuit with 15 watts or Simul-Class with 75 watts (15 watts plus 60 watts).
Perfect as a power amp for preamps or pedal amps, but can also be used as a single-channel guitar amp.
Warm, creamy sounds with sufficient headroom.
Completely checked in our workshop.

✅ Model: Mesa Boogie Simul-Satellite
✅ Year of construction: 1990
✅ Full tube power amp combo
✅ Simul-Class power amplifier technology
✅ 1x12" combo
✅ Speaker: Electro-Voice EVM 12L
✅ Wooden housing
✅ 4x 6L6 power tubes
✅ Hand-made in the USA

Withdrawal of Contract
0
    0
    Shopping Cart
    Your cart is empty